翻訳と辞書
Words near each other
・ Beijing Shou Du Shenghuo Guangbo
・ Beijing Shougang
・ Beijing Shuren Ribet Private School
・ Beijing Social and Economic Research Institute
・ Beijing South Railway Station
・ Beijing South Railway Station (Beijing Subway)
・ Beijing Special Weapons and Tactics Unit
・ Beijing Sport University
・ Beijing Spring
・ Beijing Spring (band)
・ Beijing Street Church
・ Beijing Students' Autonomous Federation
・ Beijing Subdistrict, Guangzhou
・ Beijing Suburban Railway
・ Beijing Subway
Beijing Subway rolling stock
・ Beijing Subway Rolling Stock Equipment Co. Ltd.
・ Beijing Symphony Orchestra
・ Beijing Technology and Business University
・ Beijing Television Cultural Center
・ Beijing Television Cultural Center fire
・ Beijing Temple of Confucius
・ Beijing Tennis Center
・ Beijing This Month
・ Beijing Tigers
・ Beijing Times
・ Beijing Tiyu Guangbo
・ Beijing to Boston
・ Beijing Today
・ Beijing Tongren Hospital


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Beijing Subway rolling stock : ウィキペディア英語版
Beijing Subway rolling stock

All Beijing Subway trains run on 1,435mm standard gauge rail and draw power from the 750 V DC third rail, except those on Lines 6 and 14, which use 1,500 V DC overhead wires.〔(【引用サイトリンク】title=交通委谈轨道交通14号线西段开通试运营情况 )〕 Lines 6, 15, Fangshan, and Changping have a designed maximum service speed of 100 km/h.〔(New Beijing subway to ease traffic congestion, Wu Wenjie, deputy director of China Railway Tunnel Group, China Daily. ) Reporter ZHENG Xin. 2012-11-26.〕 The Airport Line is linear motor driven with a designed maximum service speed of 110 km/h〔("Linear Motor Commuter for Beijing" ''CNR website'' ) Accessed Mar. 27, 2010〕〔(【引用サイトリンク】title=机场线轨道车辆有哪些先进设计? )〕 All other Lines have a maximum service speed of 80 km/h. Currently Lines 1, 2, 4, 5, 8, 9, 10, 13, 15, Batong, Daxing, Changping, Fangshan, and Yizhuang use 6 car B size trains. Initially, Lines Batong and 13 was originally used 4 car trains and now expanded into six.〔(【引用サイトリンク】title=北京地铁2号线全部更换空调车 八通线扩编完成 )〕〔(【引用サイトリンク】title=北京地铁流量迫近400万 计划新车上线城铁扩编 )〕〔(【引用サイトリンク】title=13号线列车扩改任务全部完成 增至六节车厢 )
== Manufacturers ==

From the subway's inception to 2003, all Beijing subway trains were manufactured by the Changchun Railway Vehicles Company Ltd., now a subsidiary of the China CNR Corporation. All rolling stock on Lines 2, 5, 6,〔(【引用サイトリンク】title=北京地铁6号线斥资30亿购进512辆新车 )〕 9, 10, 13, 15, Yizhuang, Airport and some of Line 1 and 14 stocks〔〔(Chinese) (吉林日报 ) July 31, 2009〕 are produced by CNR. However, Qingdao Sifang Locomotive & Rolling Stock Co., Ltd., a subsidiary of China South Locomotive and Rolling Stock Corp. has recently produced rolling stock for the Beijing subway. CSR produced all the trains for Lines 4,〔(【引用サイトリンク】date=2009-07-31 )〕 8, Daxing,〔 Changping〔(【引用サイトリンク】date=2010-09-08 )〕 and newer batches of trains for Line 1 and 14.〔〔(Chinese) () July 30, 2009〕〔(Chinese)(最高运营时速100公里 ) Dec. 31, 2009〕
The Beijing Subway Rolling Stock Equipment Co. Ltd., a wholly owned subsidiary of the Beijing Mass Transit Railway Operation Corp., provides local assemblage, maintenance and repair services.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Beijing Subway rolling stock」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.